Step 1: Select your dimensions and metrics

Choose a configuration of the Data Explorer grid that provides you with the data that you need for your analysis or report. Note that you should probably include the Date dimension if you need to group your data over different time ranges.

The above dimension selection was paired with a set of six metrics. In order to save cells in your Google Sheet, you can avoid including metrics that are calculated using other metrics that you have available to you in Funnel (we often refer to these calculated metrics "derived metrics", such as CPC). 

Your grid will now likely look something like this (be aware that you can compress the left navigation menu by hitting the small arrow in the top left corner, giving you more space for investigating the table):

Before continuing, make sure that you have selected the appropriate date range for your export. Note that if you want to create a scheduled daily export, you should consider choosing a date range that includes future dates!

Step 2: Create your Google Sheets export

Select the Export option for Google Sheets.

Next, connect your Google account, make sure that this account has access to the Google Drive that you want your export to be placed in.

Decide if you want to create a new spreadsheet for your export, or export your data to an existing spreadsheet (Note: data exported to an existing spreadsheet will overwrite any previous data from Funnel that is stored there.)

Click the Export now button to push your data to a spreadsheet.

Step 3 (optional): Schedule your export to run daily

Once the export is complete, you can now choose to schedule it as a daily upload of data to your Google Sheet (note that this requires you to have access to the Google Sheets Upload feature in your account. If this is not the case, please reach out to your Account Executive and let them know that you want to try out this feature). 

Click Schedule this export and choose a time of day that you want the export to be recurring at. If you want a different range of data to be exported, there are some options to choose from as well.

Well done! You have scheduled an export of data from Funnel to Google Sheets to be run each day.

Next: Google Data Studio visualisation

If you want an easy introduction to how you connect this exported data to Google Data Studio, continue to this article.

Did this answer your question?